摘要:The paper presents the process of improving the safety and reliability of operation the 18K370 steam turbines Opole Power Plant since the first failure in 2010 [1], up to install the on-line monitoring system [2]. It shows how the units work and how to analyse the contol stage as a critical node in designing the turbine. Selected results of the analysis of the strength of CSD (Computational Solid Dynamic) and the nature of the flow in different operating regimes - thanks to CFD (Computational Fluid Dynamic) analysis have been included. We have also briefly discussed the way of lifecycle management of individual elements [2,3]. The presented actions could be considered satisfactory, and improve the safety of operating steam turbines of type 18K370.